Drainage Beach and Southside Pond Improvements

  • Estimated Cost

    $5,681,000

Description

The intent of this project is to improve water quality by improving approximately 1,000 feet of channel conveyance in Pottsburg Creek and installing a 7.5-acre wet detention facility for water quality treatment. This project will contribute to the pollutant load reduction required by the Lower St Johns River (LSJR) Basin Management Action Plan (BMAP) and NPDES permit requirements. (Project PC‐5A in MSMP)

Council District

4