Drainage Bowden and Belfort Pond Improvements

  • Estimated Cost

    $1,930,850

Description

The intent of this project is to improve water quality by retrofitting and assuming responsibility for an existing 10-acre offline wet detention facility at the intersection of Belfort Road and Bowden Road. This project will contribute to the pollutant load reduction required by the Lower St. Johns River (LSJR) Basin Management Action Plan (BMAP) and NPDES permit requirements. (Project PC‐6A in MSMP)

Council District

4