Drainage Duval Road Wet Detention Pond

  • Estimated Cost

    $9,530,000

Description

This project addresses water quality and flood control within the Cedar Creek sub‐basin. It includes the construction of a 25‐acre wet detention facility. The RSF was designed as an off‐line pond southwest of the I‐295 Duval Road exit ramp with a retention period of 13 days, a maximum depth of 10 feet, a permanent pool volume of 274 ac‐ft, and a total surface area (including maintenance buffer) of approximately 25 acres.

Council District

7