Skip to Project List

Roadway Edgewood Avenue Corridor (Complete Street Project)

  • Estimated Cost

    $12,116,500

Description

The project consists of reducing the existing five lane section to a three lane section from east of I-95 (from the beginning of the Moncrief Creek Bridge approach at Lorain Street) to Lem Turner Road, restriping travel lanes from 12-foot to 11-foot, and installing bike lanes and sidewalks. From Lem Turner Road and U.S. 1 (New Kings Road), replace existing 12-foot dual left turn lane with a 16-foot landscaped median with left turn pockets and restripe travel lane widths from 12-foot to 11-foot. Incorporate Americans with Disabilities Act accessible transit stops, including improved amenities, and immediate sidewalk connectivity. (City Owned)

Status

Pending

Council District

8, 10

Estimated Jobs Created

42