Roadway Edgewood Avenue Corridor Improvements

  • Estimated Cost

    $12,116,500

Description

The project consists of reducing the existing five-lane section to a three-lane section from east of I‐95 (from the beginning of the Moncrief Creek Bridge approach at Lorain Street) to Lem Turner Road, restriping travel lanes from 12‐foot to 11‐foot, and installing bike lanes and sidewalks. From Lem Turner Road and U.S. 1 (New Kings Road), replace the existing 12‐foot dual left-turn lane with a 16‐foot landscaped median with left-turn pockets and restripe travel lane widths from 12‐foot to 11‐foot. Incorporates Americans with Disabilities Act accessible transit stops, including improved amenities and immediate sidewalk connectivity.

Council District

8