Roadway Lem Turner Road Corridor Improvements

  • Estimated Cost

    $4,185,500

Description

The project consists of restriping Norwood Avenue between Golfair Boulevard and I‐95 to modify the existing four‐lane undivided section, converting the outside lane to a shared bike/bus lane to support Bus Rapid Transit (BRT) operations. Installation of a roundabout with high emphasis crossings and refuge islands at the intersection of Norwood Avenue and Golfair Boulevard. Incorporates Americans with Disabilities Act accessible transit stops, including improved amenities and immediate sidewalk connectivity.

Council District

7