Roadway Park and Blanding Corridor Improvements

  • Estimated Cost

    $3,212,000

Description

The project consists of reconstruction of the Blanding Boulevard overpass to reduce the existing three southbound lanes to two lanes and reduce all lane widths from 12‐foot to 11‐foot. Replacement of the existing center concrete barrier with an eight-foot-wide raised landscaped median and installation of a 12‐foot wide multi‐use path with a six-foot-wide raised buffer between the northbound travel lanes and the path. Incorporate Americans with Disabilities Act accessible transit stops, including improved amenities, immediate sidewalk connectivity throughout, midblock pedestrian crossings with signage at Park Street intersections with Boone Park, Ingleside Avenue, Avondale Avenue, Willow Branch Park and west of King Street.

Council District

14