Roadway Park Street/Blanding Boulevard Corridor (Complete Street Project)
-
Estimated Cost
$3,212,000
Description
The project consists of reconstruction of the Blanding Boulevard overpass to reduce the existing three southbound lanes to two lanes and reduce all lane widths from 12-foot to 11-foot. Replacement of the existing center concrete barrier with an 8-foot wide raised landscaped median and installation of a 12-foot wide multi-use path with a 6-foot wide raised buffer between the northbound travel lanes and the path. Incorporate Americans with Disabilities Act accessible transit stops, including improved amenities, and immediate sidewalk connectivity throughout, with midblock pedestrian crossings with signage at Park Street intersections with Boone Park, Ingleside Avenue, Avondale Avenue, Willow Branch Park and west of King Street. (City ownded except FDOT owns 0.75 mi bridge section)
Status
Planning
Council District
7