Drainage Sapp Road Wet Detention Pond

  • Estimated Cost

    $4,065,661

Description

The intent of this project is to improve water quality by improving approximately 1,000 feet of channel conveyance in Caney Branch Creek and installing a 7.5-acre wet detention facility for water quality treatment. This project will contribute to the pollutant load reduction required by the Lower St. Johns River (LSJR) Basin Management Action Plan (BMAP) and NPDES permit requirements. (Project CN‐1A in MSMP)

Council District

2